E3 Biofuels, LLC v. Biothane, LLC

Docket Number: 14-1894
Judge: Raymond W. Gruender
Opinion Date: March 25, 2015

In 2005 E3’s predecessor began construction of an ethanol plant, to be powered, in part, by methane, and contracted with Biothane for a boiler system. Biothane, an expert in systems integration but not in boilers specifically, subcontracted with PEI to install and integrate the boilers. Biothane retained overall responsibility. Both are engineering companies. In 2007, PEI’s engineer repeatedly tried and failed to light the main flame of one of the boilers. The repeated attempts caused gas to build up and explode. E3 claims that the boiler never worked properly afterward and that the plant failed as a result. The plant’s owners eventually reorganized in bankruptcy. In 2011 (3 years and 364 days after the explosion) E3 sued, alleging torts against both companies and breach of contract against Biothane. The district court granted defendants summary judgment, finding all of E3’s claims time-barred under Neb. Rev. Stat. 25-222, Nebraska’s two-year limitations period for actions based on professional negligence. The Eighth Circuit affirmed. Regardless of whether the chain of events ultimately led to the breach of a contract, E3 still sued Biothane “for an action performed in a professional capacity.” View “E3 Biofuels, LLC v. Biothane, LLC” on Justia Law

View "E3 Biofuels, LLC v. Biothane, LLC" on Justia Law

Comments are closed.